St George’s Hospital Steel Staircases

LocationSt George's Hospital, London
SectorHealthcare
ScopeStructural steel beams and posts, bespoke staircases, plant deck access
Steel and finishIntumescent paint; galvanised railings

Two J's Metalwork designed, fabricated and installed bespoke steelwork for the construction of a new hospital unit at St George's Hospital, London.

St George’s Hospital Steel Staircases
St George's Hospital Beams

01

The Challenge

Constructing a new hospital unit requires exceptional attention to detail. Every structural element must meet strict safety standards while supporting a busy healthcare environment where reliability is critical. The project was delivered over multiple phases, each with its own technical challenges.

St George’s Hospital Steel Staircases

02

The Solution

Phase 1: structural steel beams and posts were fabricated and coated with intumescent paint at our workshop, then craned into place on site. Phase 2: several staircases were designed to be fire safe and DDA compliant, with one key staircase fully fabricated in our workshop, assembled, then lifted into position by crane. Phase 3: access to the plant deck, including a tower, CAT ladder, access gate and a rooftop walkway in open steel flooring with 20mm ball proof grating and galvanised railings.

Mesh flooring

03

The Result

From structural steelwork to specialist fire protection and access solutions, the work supported the construction of this new hospital unit. Managing both the manufacturing and the fitting in-house met the high standards expected on a major healthcare development.

Intumescent paint is a specialist coating that expands when exposed to extreme heat, forming a protective layer that insulates the steel and delays structural failure, giving occupants extra time to evacuate in the event of a fire.